DPP-80 Mini Liquid Blister Packing Machine

DPP-80 Mini Liquid Blister Packing Machine

Application:

Suitable for food industry jam, butter, honey, tomato sauce, chocolate sauce, candy and so on small cup packaging; cosmetics industry hair mask, face oil, essential oil, mouthwash and other small sample packaging.

Product Description:

Machine Running Video

Introductions

The machine is new innovating designed by our machine which is widely for packaging of liquid/paste products such as jam, honey, butter, chocolate, eye mask, hair mask, face mask in blister packing with Alu/PVC  in the field of health product, foodstuff, cosmetic, etc.

Machine Working Stations

PVC loading

Alu foil
Control panel, forming heating device

Feeder

Mold forming, Alu foil loading
Heat sealing, traction, punching

Features

  1. It adopts the newest type high-power transmission mechanism to arrange the chain and drive the main driving shaft. The errors and noises of other gear wheel transmission can be avoided.
  2. Imported controlling system is adopted;also it can be equipped with detecting and rejection function device for number of medicines according to the user’s requirement.
  3. Itadopts photoelectrical controlling system to make PVC, PTP, Aluminum/Aluminum material to be automatically fed and waste side to be cut automatically to guarantee the Synchronous stability of over- length distance and multi station
  4. It can be optional equipped with photocell correction device, imported stepper motor traction and image- character register to optimize packing grade.
  5. The machine is suitable for industries of foodstuff, medicine, medical instruments, hardware,electronics and etc for packing.
  6. Replacement of ordinary material winding shafts with air-rising shafts
  7. Double-row feeder: Much higher loading rates for filling
  8. Handwheel adjustment for easy operatio Debugging scale

Technical Parameter

Machine Working Process

Our Warranty

The seller makes guarantee that the machines are new (or unused) and the guarantee period will be 12 (twelve) months, which starts from the date of the machine’s arrival. During this Warranty period, the seller will provide free spare parts that cause by the machine’s quality within 10 days by fast courier upon receipt of buyer’s notice, with one condition that the freight will be affected by the buyer. If required for more spare parts additionally, the seller will arrange to have them got ready within 10 days on the buyer’s account.

Installing & Commissioning

Installation will be done by our technician (if needed) after the machine placed at the site. All the utilities like water electrical will be connected by you. We shall depute our technicians after receiving your confirmation for the pre installation readiness. All our expenses including round –trip air ticket to the nearest airport, local conveyance to your factory ,Lodging & Boarding expense shall be paid by you. In case the stay of our technician, the service charge at US$100 per day will be charged extra.

Contact Us For A Professional Quote